Pwd Schedule Of Rates 2018-19 Karnataka Pdf -

Many users searching for the "pwd schedule of rates 2018-19 karnataka pdf" land on fake or outdated portals. Avoid these mistakes:

Avoid if you need current bid estimates, DSR 2023–24, or CPWD/DAR rates.


The PWD Schedule of Rates 2018-19 Karnataka PDF is more than just a price list; it is a legal and technical document that governs financial settlements for infrastructure projects from the Modi 2.0 era (early 2019). For contract management, arbitration, and historical cost analysis, this file remains an indispensable tool.

Final actionable step: Visit the official Karnataka PWD e-Procurement portal, navigate to "Downloads" -> "SoR Archives" to grab the authenticated copy. If the file is missing, file an RTI (Right to Information) request with the Executive Engineer of your district to obtain a certified digital copy.


Disclaimer: Rates mentioned in this article for illustration (e.g., Cement at ₹300, Plastering at ₹98) are indicative summaries. Contractors and engineers must refer to the original PDF published by the Karnataka Government for exact figures, as minor district variations apply.

The Karnataka Public Works Department (KPWD) Schedule of Rates (SR) for 2018-19 serves as the official benchmark for estimating costs in government construction projects across the state. This document is essential for contractors and engineers to determine standardized pricing for materials, labor, and machinery. Key Highlights of the 2018-19 Schedule

Base Specifications: The 2018-19 SR largely retained the technical specifications from the 2016-17 version but updated the unit rates to reflect market changes.

Interest Rate Reduction: A significant administrative change was the reduction of the interest rate on capital cost from 11% to 9%.

Variable Dearness Allowance (VDA): Labor rates were adjusted based on a VDA of approximately ₹61.00 per day, calculated from the 2017 state average consumer price index for industrial workers. Standardized Material Costs:

Cement: Fixed at approximately ₹4,879 per MT (roughly ₹244 per bag).

Steel (TMT): Fixed at approximately ₹45,616 per MT for general PWD works.

M-Sand: Use of Manufactured Sand (M-Sand) was actively encouraged over river sand to meet environmental guidelines. Typical Rates for Construction Materials (2018-19) Material Item Rate (Approx. ₹) Cement (43 Grade) Reinforcement Steel Manufactured Sand (M-Sand) Cubic Meter Coarse Aggregate (20mm) Cubic Meter Burnt Bricks (1000 Nos) Bitumen (80/100 Grade) pwd schedule of rates 2018-19 karnataka pdf

Data sourced from Scribd PWD SR 2018-19 and KBJNL Official Documents. Usage Notes for Estimates

GST Exclusion: Most rates listed in the SR are exclusive of GST. For contracts during this period, GST (typically 12%) was added separately to the final estimate.

Overheads & Profit: Estimates typically include 10% for Contractor’s Profit and 10% for Overhead Charges.

Area Weightage: Specific circles (e.g., Dharwad, Bangalore, Shimoga) may have slight variations or "area weightages" for transport and local conditions. Download Resources 2018-2019 SR Bangalore | PDF - Scribd

The Karnataka Public Works Department (KPWD) Schedule of Rates (SR) 2018-19 is a critical document used for standardizing construction costs across state-level projects. It provides a comprehensive list of fixed prices for materials, labor, and machinery, ensuring transparency and accuracy in budget estimations for government and private infrastructure. Key Features of the SR 2018-19

The 2018-19 edition introduced several refinements to previous years' procedures to better reflect market realities.

Cost Components: Rates typically include the cost of supply, carriage (transport), handling, fitting, and scaffolding.

Reduced Interest on Capital: The rate of interest on capital cost for machinery was reduced from 11% to 9% in this edition. Labor and Materials:

Labor Charges: Increased by approximately 10% based on the latest labor indices.

Material Rates: Prices are generally inclusive of taxes and freight.

Provisions: Profit and overheads remained consistent with the 2016-17 framework, maintaining standard contractor margins. Many users searching for the "pwd schedule of

Area Weightages: Additional percentages are added for difficult terrains:

Hill Stations: Motorable areas can receive a weightage of up to 20%, while non-motorable areas can go up to 25%.

Special Zones: Forest areas (5%) and factory zones (3%) also receive specific rate increments. Sample Material Rates (2018-19)

Below are representative rates from the Dharwad and Mysore circles for common construction items: Item Description Rate (Approx. ₹) Cement (PPC/OPC) Steel (Reinforcement) Standard Bricks (Ground Moulded) Crushed Stone Aggregate (20mm) Tile Adhesive Usage and Structure

The document is often divided into volumes based on the type of work to simplify the estimation process:

Volume I: Common SR: Covers general earthwork, excavation, and concrete items applicable to all engineering departments.

Volume II: Buildings: Specific rates for masonry, woodworks, flooring, and finishing.

Volume III: Roads and Bridges: Tailored for highway engineering following MoRTH (Ministry of Road Transport and Highways) standards.

Special Volumes: Separate schedules exist for Electrical works (Volume VI) and Water Supply/Sewerage. Karnataka PWD Schedule of Rates 2018-19 | PDF - Scribd

Karnataka Public Works Department (PWD) Schedule of Rates (SR) for 2018-19

is a critical regulatory document used for standardizing construction costs across state infrastructure projects. It serves as the benchmark for estimating, tendering, and auditing public works including buildings, roads, and bridges. Accessing the 2018-19 Schedule of Rates The PWD Schedule of Rates 2018-19 Karnataka PDF

While the state periodically updates these volumes, the 2018-19 editions remain relevant for historical auditing and ongoing projects initiated during that fiscal period. You can find digital copies through the following sources: Official Karnataka PWD Portal

: The department maintains an archive of various volumes. Check the KPWD Downloads section for building-specific data. Krishna Bhagya Jala Nigama Limited (KBJNL) : Provides the Water Resources SR 2018-19

, which was prepared by a specialized committee to include updated material and labor costs. Circle-Specific Documents

: Rates are often released by specific administrative circles. For instance, detailed spreadsheets and PDFs exist for the Dharwad Circle Mysore Circle Key Components of the 2018-19 SR

The 2018-19 schedule introduced or maintained several critical financial structures: Labor & Material Indexing

: Minimum wages were updated based on the state's annual average CP index for industrial workers. Operational Overheads : A standard 10% overhead charge 10% contractor's profit

were generally factored into the finished rates for building items. Taxation (GST)

: While older rates were inclusive of various taxes, subsequent government orders (like PWD 51 RDF 2019) began requiring GST (typically 12% at the time) to be added separately to estimates. Standardization : The specifications align largely with the CPWD (Central Public Works Department)

guidelines, covering everything from excavation and mortar mixes to specialized firefighting and electrical components. Importance in Governance

By providing a uniform "price list" for every unit of work—from a cubic meter of cement mortar to a hectare of jungle clearance—the SR prevents arbitrary pricing in government contracts. It ensures that whether a project is in Bangalore or a remote hill station (which might receive an area weightage

of up to 20-25% for difficult terrain), the financial foundation is transparent and equitable. Karnataka PWD Schedule of Rates 2018-19 | PDF - Scribd

Karnataka is geographically diverse. The 2018-19 SoR was unique because it listed Basic Rates of Materials for each district separately (Bengaluru Urban, Mysore, Hubli-Dharwad, Belagavi, Kalaburagi, etc.).

A comprehensive, item-rate reference for public works contracts in Karnataka, but outdated for current market prices (2018–19 base). Useful for historical analysis, arbitration, or legacy projects, not for fresh estimates.