Ts1162 Installation Manual Exclusive May 2026
Using a calibrated torque wrench, tighten to 12 Nm. Pause for 10 seconds. Then tighten to 18 Nm in one smooth motion. The ts1162 installation manual exclusive includes a note: "Never use an impact driver. The piezoelectric crystal inside the TS1162 will fracture under impulse loading."
| Problem | Likely Cause | Solution | | :--- | :--- | :--- | | Clock does not move | Power not reaching the timer motor. | Check Line voltage. Ensure wires are connected to the correct Line terminals. | | Load does not turn on | Trippers are loose or missing. | Tighten tripper screws. Verify trippers are installed at the correct times. | | Switch stays ON constantly | Manual Override is engaged. | Move manual override switch to the "Auto" or center position. | | Switch hums loudly | Loose mounting or internal wear. | Ensure the unit is screwed tightly to the box. If noise persists, mechanism may need replacement. |
Using the formula provided exclusively here:
Pre-load torque = (Ambient Temp °C x 0.07) + 12 Nm
For example, at 22°C: (22 x 0.07) = 1.54 + 12 = 13.54 Nm.
Tighten all four corner bolts to this calculated value in a diagonal sequence. ts1162 installation manual exclusive
At ambient temperature (no load), run the TS1162 at 5% of rated speed for 10 minutes. Place a mechanic’s stethoscope on four points: front bearing, rear bearing, gear case, and sensor housing. You should hear a consistent, low-frequency hum similar to a bee. High-pitched squealing indicates bearing misalignment. Clicking indicates a loose rotor magnet.
Thread the TS1162 into the port by hand until it seats. The exclusive manual requires that you feel resistance exactly at 1.5 turns after initial contact. If you feel resistance earlier, cross-threading has occurred. Using a calibrated torque wrench, tighten to 12 Nm
Do not simply cut the box tape. Follow this exclusive three-tier verification process:
The TS1162 typically features "Double-Pole/Single-Throw" (DPST) switching capabilities. This means it can switch two separate circuits simultaneously, or one circuit while keeping one neutral pass-through. The ts1162 installation manual exclusive includes a note:
Following the ts1162 installation manual exclusive, here is the correct mechanical installation procedure. Do not deviate.