Not The Stages Of Pdca Cycle Best | Which Among Below Are
When you see a multiple-choice question like “Which among below are not the stages of the PDCA cycle?”, the test maker will provide 4–6 options. Typically, 2–3 are correct PDCA stages, and the rest are fakes.
Below are the most frequently appearing incorrect options. These are NOT stages of PDCA.
To help you internalize this, let’s review actual question formats.
Question 1:
Which among below are not the stages of the PDCA cycle?
A) Plan
B) Do
C) Analyze
D) Act which among below are not the stages of pdca cycle best
Answer: C) Analyze.
Explanation: Analyze is a DMAIC phase, not a PDCA stage. The four stages are Plan, Do, Check, Act.
Question 2:
Select the option that is NOT a stage in the Deming Cycle (PDCA).
A) Check
B) Measure
C) Act
D) Plan
Answer: B) Measure.
Explanation: Measure is part of the Six Sigma DMAIC framework. PDCA uses Plan, Do, Check, Act. When you see a multiple-choice question like “Which
Question 3 (Harder):
Which combination contains only stages that are NOT part of PDCA?
A) Plan, Do, Check
B) Analyze, Improve, Control
C) Act, Standardize, Do
D) Plan, Measure, Act
Answer: B) Analyze, Improve, Control.
Explanation: All three belong to DMAIC. None are PDCA stages. (Note: In option C, “Standardize” is not PDCA, but “Do” and “Act” are, so C is incorrect because it mixes real and fake.)
| Real PDCA Stage | Common Fake (NOT PDCA) | Belongs To | |---------------------|----------------------------|----------------| | Plan | Define | DMAIC | | Plan | Analyze | DMAIC | | Do | Measure | DMAIC | | Check | Improve | DMAIC | | Act | Control | DMAIC | | Act | Standardize | SDCA | | (None) | Evaluate (if separate from Check) | Generic | Any term that is not one of these
Before identifying what is not part of the cycle, let us establish the gold standard. The genuine stages are:
Any term that is not one of these four—or a direct synonym (e.g., “Evaluate” for Check)—is likely a distractor.